---
title: "Wholesale industrial tubing for bulk purchasing"
canonical: "https://yuannaitube.com/wholesale-industrial-tubing/"
language: "en-US"
---

**BULK PURCHASING**

# Wholesale industrial tubing for bulk purchasing

Compare materials, confirm dimensions and plan repeat orders with YUANNAI TUBE. Source tubing for **pneumatic equipment**, production lines and distribution.

PU

NYLON

PE

FEP / PFA

REPEAT ORDERS

 [Request a bulk quotation](<https://yuannaitube.com/contact/>)  [Choose a material ↓](<https://yuannaitube.com/wholesale-industrial-tubing/#ws-materials>)

**Scope note:** standard MOQ is 500 m per specification. Lead time is 5–12 working days for standard products and 8–15 working days for FEP, PFA and **high-pressure composite tubing**. Final terms are confirmed with each quotation.

MATERIAL SELECTION

## Choose tubing around your application

Start with the material family, then check the product specifications against your medium, temperature, pressure and installation requirements.

![PU tubing product coil](<https://yuannaitube.com/wp-content/uploads/2026/10/pu-logo.jpg>)

### PU tubing

Flexible **pneumatic tubing** for equipment and air-line purchasing.

 [View specifications →](<https://yuannaitube.com/products/pu-tubing/>)

![Nylon tubing product coil](<https://yuannaitube.com/wp-content/uploads/2026/10/company-product-33-1-20261012.webp>)

### Nylon tubing

Compare PA6 and PA12 grades for your installation requirements.

 [View specifications →](<https://yuannaitube.com/products/pa6-nylon-tubing/>)

![PE tubing product coil](<https://yuannaitube.com/wp-content/uploads/2026/10/company-product-37-1-20261012.webp>)

### PE tubing

Review **polyethylene tubing** dimensions and application conditions.

 [View specifications →](<https://yuannaitube.com/products/pe-tubing/>)

![Fluoropolymer tubing product coil](<https://yuannaitube.com/wp-content/uploads/2026/10/company-product-35-1-20261012.webp>)

### Fluoropolymer tubing

Compare FEP and **PFA tubing** for your media and operating conditions.

 [View specifications →](<https://yuannaitube.com/products/fep-tubing/>)

 [Explore all tubing series →](<https://yuannaitube.com/products/>)

BUILD YOUR PURCHASING BRIEF

## A clearer specification makes a better quotation

For **wholesale tubing** enquiries, send the information below for each line item. If a requirement is undecided, tell us the intended application so we can discuss the options.

 [Send your purchasing list](<https://yuannaitube.com/contact/>)

### 01 · Product & dimensions

Material or existing model, outer and **inner diameter**, dimension units, color, and straight or recoil format.

### 02 · Operating conditions

Working medium, pressure, temperature and routing requirements. Suitability must be checked against the selected model.

### 03 · Quantity & packaging

Quantity per specification, preferred roll or cut length, packaging, and expected repeat-order requirements.

### 04 · Delivery & documents

Destination, target receiving date, and required **inspection records** or supporting documentation.

## From purchasing list to repeat supply

01 / COMPARE

### Review the specification

Match each purchasing line to a material and model. Resolve dimensions and application questions before finalising the order.

02 / CONFIRM

### Agree the order details

Confirm quotation, minimum order quantity, packaging, payment and delivery terms for the requested specifications.

03 / REORDER

### Keep a consistent brief

Refer to the agreed model, specification revision, quantity and packaging when planning the next order.

### Need a custom format or private-label packaging?

Use our OEM project page for drawing-led requirements, custom dimensions and packaging discussions.

 [Explore OEM & custom tubing →](<https://yuannaitube.com/oem-custom-tubing/>)

PURCHASING QUESTIONS

## Before placing a bulk order

 [Review certificates & quality documents →](<https://yuannaitube.com/certificates/>)

### What is the minimum order quantity?

Standard specifications: 500 m per specification. Custom specifications start at 3,000 m per specification. The final minimum depends on the material, dimensions, color, packaging and order quantity, and is confirmed with the quotation.

### Can I include different specifications in one enquiry?

Yes. List each specification and its quantity separately so the available supply and order conditions can be reviewed for each item.

### Can I request samples before a bulk order?

Ask about sample availability for the selected model. Sample quantities, costs and shipping arrangements require confirmation.

### Which documents should I request?

State the documents required by your procurement or quality team. Available **certificates** and manufacturing documents can be reviewed, while order-specific records must be agreed for the selected product.

### What should I include for delivery planning?

Lead time is 5–12 working days for standard products, 8–15 working days for FEP, PFA and **high-pressure composite tubing**, and 10–20 working days for custom products. It starts after the technical specification is confirmed and the agreed payment is received. Share your destination and target receiving date; transport arrangements and delivery terms are confirmed during quotation and order review.

## Plan your next tubing purchase

Send your material, dimensions, quantities and delivery destination to start a wholesale quotation.

[Need to attach a drawing or specification? Use the full inquiry form →](<https://yuannaitube.com/contact/>)  [Want to test the tubing first? Request samples →](<https://yuannaitube.com/request-samples/>)
